Week 5: CAD Work and Calculations
- ls3458
- Apr 17, 2023
- 1 min read
This week, the Project Megaclimb team continued to perform calculations on the Torque required to turn the axles, power required for the motors, and gear ratio needed for required speed. Moreover, CAD work on the product continued, with a thread runner design being completed, focused on main structural shape and placement of pulleys. This CAD design along with a parts of the calculations has been shown below.


Comments